Industrial Automation
Industrial Automation | Europe

myKnowledge

Main > Product Type > Automation Systems > Networks
Minimize Text   Default    Enlarge Text
 

Print
E-mail

FINS Network Routing


Introduction
This tutorial is intended to explain the principles behind FINS Network routing.
 
I. Principle
The FINS network address consists of 3 fields:
Net: number assigned to arbitrary network using CX-Integrator
Node: node number assigned (front)
Unit: card number assigned (front)
The No. 0 is reserved for the CPU
The header of the FINS framework includes the FINS address of the recipient and sender.
In the example below,

a command from the PC for the CJ-CPU21 will be:

Imperative routing:

1 - The network cards must be associated with a network number with a local routing table.
2 - Bridges (here CS1) must be declared in the routing tables of all participants (NS, CJ-CPU11,-CPU21 CJ).


II. Network configuration 
PLC Configuration
1. Configure the Ethernet card in the PLC (see article Login/Configuration of CS/CJ ETN21)
2. Start the network configuration CX-Net project from your CX-Integrator (Tools menu) or directly from the menu: Start \ Program \ Omron \ CX-One \ CX-Programmer \ Network Configuration Tool CX-Net.
CS1 Configuration
1. Right click on Unit 00, No. Allow network (Ethernet = 10)
2. Right click on Unit 01, No. Allow network (Controller-Link = 20). 

 3. Move the routing table in the PLC

CJ1-CPU11 Configuration
1. Right click on Unit 00, No. Allow network (Ethernet = 10)
2. Right click on the fields LAN # xx, add the CS1 PLC gateway to the network-Link Controller (the CJ1 not seen locally).

3. Transfer the routing table in the PLC


CJ1-CPU21 Configuration
1. Right click on Unit 00, No. Allow network (Controller-Link = 20)
2. Right click on the fields LAN # xx, add the CS1 PLC gateway to the Ethernet network (the CJ1 not seen locally).

Configuration of the NS
1. Start CX-Designer
2. Turn on the Ethernet interface
3. Allow No Network Interface Ethernet (No. 10)
4. Fill in the IP field. No. Use a node identical to the last field of the IP address.

5. Return to the main item (comm-All) and add the gateway (CS1) on the LAN (10) to the Controller-Link (20)

6. Perform a rapid transfer of the project. The network is now operational.




Comments (View All Comments / Add Comment)
jXfWxURGPybxQc
The accident of fnidnig this post has brightened my day
Yadira [2012-04-16]

Related Articles
No related articles found.
Created 2009-08-23
Modified 2009-08-26
Views 18852

 

You are not logged in.